A BRIEF HISTORY OF LEAN
Initial Lean thinking were evident in Arsenal in Venice in the 1450s, but Henry Ford was first to truly integrate an entire production process at Highland Park, MI, in 1913 where he synthesised interchangeable parts with standard work and moving conveyors and created flow production. Ford aligned manufacturing lines in process sequence using special-purpose machines and gauges to fabricate and assemble the components going into the vehicle within a few minutes, and deliver perfectly fitting components directly on line.
This was a first revolutionary break from the shop practices of general-purpose machines grouped by process, which made parts that found their way into finished products. The problem with Ford's system was not the flow but it was his inability to provide variety. The Model T was not limited to black colour and also limited to one specification. All Model T chassis were essentially identical up through the end of production in 1926. Practically every machine in the Ford Motor Company worked on a single part number, and there were essentially no changeovers.
"Customers didn't have choice".
But the customers wanted variety and Ford lost his way. Other automakers responded to the need for many models, each with many options, but with production systems with much longer throughput times. Over time they populated their fabrication shops with larger and larger machines that ran faster and faster, apparently lowering costs per process step, but continually increasing throughput times. Even worse, the time lags between process steps and the complex part routings required ever more sophisticated information management systems culminating in MRP Systems
PRINCIPLES OF LEAN
The five-step thought process for guiding the implementation of lean techniques is easy to remember, but not always easy to achieve:
Specify value from the standpoint of the end customer by product family.
Identify all the steps in the value stream for each product family, eliminating whenever possible those steps that do not create value.
Make the value-creating steps occur in tight sequence so the product will flow smoothly toward the customer.
As flow is introduced, let customers pull value from the next upstream activity.
As value is specified, value streams are identified, wasted steps are removed, and flow and pull are introduced, begin the process again and continue it until a state of perfection is reached in which perfect value is created with no waste